In Yerevan, the construction of the new plant of Steko company started. A fully automated factory of industry 4.0 level and an area of 5.5 thousand m² is being built, equipped with the most modern equipment and production lines. The plant will implement the full cycle of glass processing, starting with cutting, grinding, bending, firing and ending with the production of large-format multi-layer glass packages. The new factory will be able to supply processed glass and glass packages to buildings and structures that require the most complex architectural solutions, not only in Armenia, but also abroad. Compared to the current time, Steko's production volume has increased 5 times and is about 750 thousand m² of processed glass. To be ready, all the glass for one medium-sized building can be made in 2-3 days.